- Electrical work of TVS (Tunnel Ventilation System) and ECS (Environment Control System) for DMRC (Delhi Metro Rail Corporation)
- Erection of switchyard in a remote and hilly terrain.
- Up gradation of switchyard with addition and synchronization of bay to the existing system.
- A T-off connection in a switchyard.
- 5MVA transformer with LA and its counters.
- CT, PT, LA, VCB ready to receive supply.
- A close view of installation and connection in a switchyard.
- RTCC Panel integrated into an old system
- VCB and CT side by side on same structure.
- Relay Panel coupled with existing system for central control.
- Conductor termination on transformer bushing.
- Three Panel HT Switchboard installed in a commercial establishment.
- Main Power Control Centre of a Switchyard.
- A dry type transformer installation with LT bus duct.
- Main Power Control Centre with four emergency incomers and two mains incomers, all connected by bus ducts.
- An installation with BMS controlled exhaust system.
- Installation of fully automatic Motor Control Centre.
- Multi tier cabling system.
- Bus duct termination on four 1010KVA Generators.
- Four emergency bus duct installations exiting sound proof room.
- A close view of an exhaust system installation.
- Interior work – Programmable logic switch control for a five star hotel.
- Interior lighting system – Entrance to a five star suite.
- Clean room electrical work for Pharmaceutical and related industries.
- Electrical work for Pharmaceutical laboratories.
- Electrical installation for Garment industry with lighting and power on bus trunking.
- Another view of the Garment industry installation.
- A LT Room installation
- 300mtr. long, 12mtr. high factory shed LED lighting installation
- IP65 lighting installation on a false ceiling
- Another IP65 lighting installation
- Two nos. PCC with seven nos. sandwich busduct installation
- Another view of two nos. PCC with seven nos. sandwich busduct installation
- Forced air cooled transformer installation
- Outdoor cable termination on a motor
- 1500KVA (3X500KVA) UPS installation with dry type battery bank
- 3200A, 250mtr. long sandwich bus trunking installation
- Tap off box on a sandwich bus trunking
- Expansion joint installation on a sandwich bus trunking.
- 125KW Solar installation
- 2000KVA and 1250KVA DG installation
- 35mtr. Chimney erection
- Closer view of chimney erection